Browsing by Author Amey UK

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 1 to 17 of 17
Issue DateTitleAuthor(s)
2018-12Bat Survey and Ecology Assessment : Comber Greenway
Amey UK
2016-09Black's Road park & ride extension : Environmental statement volume 3: figures
Amey UK
2016-09Black's Road park & ride extension : environmental statement Volume 1: non-technical summary
Amey UK; Banks, A.
2016-09[Black's Road park and ride] : Environmental statement
Amey UK; Banks, A.
2018-08-30Department for Infrastructure - Roads - Environmental Noise Directive Round Three - Noise Action Plan 2018-2023 : Environmental Noise Directive
Amey UK; Conroy, Christopher
2018-03Downpatrick Eastern Distributor Road : Feasibility Study : Appendix I : Future Forecast Matrices
Amey UK
2018-03Downpatrick Eastern Distributor Road : Feasibility Study : Appendix B : Origin-Destination Information
Amey UK
2018-03Feasibility Report : Downpatrick Eastern Distributor Road Feasibility Study
Amey UK
2018-03Feasibility Study : Downpatrick Eastern Distributor Road : Appendix A : Data Collection Information
Amey UK
2018-03Feasibility Study : Downpatrick Eastern Distributor Road : Appendix G : Saturn Model Validation
Amey UK
2018-03Feasibility Study : Downpatrick Eastern Distributor Road : Appendix F : Environmental Constraints Report
Amey UK
2018-03Feasibility Study : Downpatrick Eastern Distributor Road : Appendix E : Geotechnical Assessment Report
Amey UK
2018-03Feasibility Study : Downpatrick Eastern Distributor Road : Appendix H : Tuba Modelling Output Summary
Amey UK
2018-03Feasibility Study : Downpatrick Eastern Distributor Road : Appendix D : Scheme Cost Estimate
Amey UK
2018-03Feasibility Study : Downpatrick Eastern Distributor Road : Appendix C : Design Layouts & Engineering Analysis
Amey UK
2018-03Feasibility Study : Downpatrick Eastern Distributor Road : Appendix J : Ards & Down Area Plan Extracts
Amey UK
2019-09Notification of Determination That Proposed Flood Alleviation Scheme Is Not Likely To Have Significant Effects On The Environment : Newry, Co. Down Flood Alleviation Scheme Stage One
Department for Infrastructure; Amey UK